Part 4/5:
The keen interest lies in observing whether adjustments can lead to the confirmation of excess heat or altered performance. The research team has meticulously characterized the expected temperatures based on power supply, gas types, and varying pressures, compiling this data into a comprehensive graph.
With calibration completed, preparations are underway to introduce hydrogen into the wire, a move anticipated within the next 24 hours. The aim remains focused on aligning the experimental conditions closely with the established calibration curves to identify any significant deviations in temperature that could indicate excess heat production.