Part 7/12:
The vehicle's ride quality even on the rough test track was impressive, with the custom suspension and insulation maintaining comfort and handling. The team verified the new sensors, wiring, and software configurations, ensuring reliable data collection during operation.
Testing for Faults and Final Tweaks
The team’s primary goal was to push the vehicle until faults surfaced, identifying any weaknesses in hardware or software. Over several days of intensive laps, they carefully monitored fault codes, temperatures, and system responses.