You are viewing a single comment's thread from:

RE: LeoThread 2025-11-05 23-35

in LeoFinance23 days ago

Part 9/16:

The discussion acknowledges the monumental task of scaling infrastructure — from manufacturing chips to constructing solar farms and erecting high-capacity grids. Major obstacles include the availability of skilled tradespeople willing to move to remote locations, the logistics of heavy equipment deployment, and the urban planning required for vast renewable projects.

The insight stresses that physical and logistical constraints, such as permitting and local infrastructure, are often underestimated but are just as important as technological advancements. The builders—Tesla, XAI, and others—must operate within these real-world limits, which could slow down or complicate the swift deployment of AI infrastructure.

The Chip Bottleneck and Hardware Strategy