As the bus conversion progressed, each step was filled with varying degrees of satisfaction and revelations. The interior began taking shape with the installation of a subfloor that involved several layers designed to resist moisture and provide insulation. Following the foundation work, walls were framed using durable metal self-tapping screws, setting up areas for a living room, a kitchen, and a full-size bathroom.

The design process was a blend of creative vision and practical execution. A second bedroom loft emerged alongside the master bedroom, and innovative use of space characterized the layout—there was a focus on maximizing utility without sacrificing comfort.

Plumbing and Electrical Wiring: The Technical Aspects