Part 3/10:
Last year, the project team renovated the granite ruin by excavating the ground floor, reconstructing the walls, and adding a temporary floor on the ground level. They had even topped the structure with a roof, effectively transforming the building into a two-story structure. Now, the focus shifts to removing the makeshift flooring and implementing a permanent one, alongside an innovative homemade insulation system.