You are viewing a single comment's thread from:

RE: LeoThread 2025-06-24 04:27

in LeoFinance4 months ago

Part 7/10:

With lessons learned from initial tests, the team sources abundant clay from an old brick factory and straw from a friendly local source. They revamp their production methods by creating efficient molds, stepping into a "production line" mode at camp to expedite the fabrication of insulation panels that will eventually grace their floors.

With two molds working simultaneously, the team is able to produce a sufficient number of panels—almost 30 in total—allowing them to make quick progress. As drying comes to an end, they prepare for the next phase: fitting the panels into the new floor structure.

Final Steps in Floor Installation