Part 8/10:
After two weeks of drying, the time arrives to lay down the insulation panels. Each panel, meticulously crafted from the straw and clay mix, needs to fit precisely between the beams of the structure, bringing with it the promise of improved energy efficiency in this sustainable abode.
The task becomes a collaborative effort, with team members measuring and cutting the panels to ensure they fit snugly. As they work, an air of satisfaction prevails—the flooring is coming together, a testament to their dedication and shared vision.