Construction Methods for Tailings Embankments

Upstream Construction Method

The Upstream construction method begins with the establishment of a starter dyke, which acts as the initial barrier to contain the tailings. A discharge pipe, or spigot, is positioned to release the tailings into the area behind the dyke. As the waste flows in, it creates a beaching effect, where the materials settle and form the embankment.