Part 7/8:
Hank’s gas manifold is constructed from standard copper plumbing materials, demonstrating the practicality of his setup. He notes that while constructing the manifold, he encountered challenges, such as discovering directional leaks in valves, which he attributed to the learning curve of his initial assembly process. Adjusting his setup based on these lessons, he eventually crafted an efficient and workable model that met his needs.