You are viewing a single comment's thread from:

RE: LeoThread 2025-04-11 16:16

in LeoFinance6 months ago

Part 3/7:

Once the meshes were prepared, the focus shifted to their precise placement within the vacuum system. The goal was to ensure that the meshes were centered over the heater, optimizing heat distribution across the surfaces. The demonstration highlighted the importance of maintaining a tidy arrangement, with all strands securely in place. This meticulous execution is vital to prevent operational issues later on.

Vacuum Sealing with Copper Rings