You are viewing a single comment's thread from:

RE: LeoThread 2025-07-03 18:57

in LeoFinance4 months ago

Part 1/5:

Transcript Summary: Testing High Voltage and RF Equipment on HMCS Ships

The transcript provides an insight into the technical activities being performed on HMCS ships, focusing on high voltage testing, RF output assessment, and equipment calibration.

High Voltage Testing and Transformer Evaluation

The team is actively testing the high voltage parameters of a transformer. This involves pushing the limits of the transformer’s capacity to understand its operational boundaries. These tests are essential to ensure the equipment can handle the specified electrical loads safely and reliably during deployment.

RF Output Testing and Countermeasure Devices