Part 8/9:
Upon reaching Santa Cruz, Tenerife, tasks unfolded to safely disconnect the rig. After a detailed procedure, the West Bolster was loosed and prepared for its inaugural drilling endeavors, concluding the tug’s role in one of the most significant marine transports.