Once the earthwork phase is complete, the construction will give rise to substantial buildings across the 1,600-acre site. Managing water runoff is a critical aspect that involves intricate drainage systems and large ponds. Engineering these ponds requires specific soil conditions to ensure they can withstand significant water volumes.
Landmark is not only excavating and hauling but is also meticulously setting aside select materials essential for the dam constructions to manage water flow.
Conclusion
As we draw our visit to a close, the enormity of this project is not lost on us. The intention is straightforward: flatten the land to build flat buildings effectively, requiring precise planning and execution of numerous operational facets.