Part 7/8:

As the final two lattice sections complete the upper assembly, the crane is capped off with a folding LF jib, elevating the machine to an impressive height of approximately 180 meters.

Before lifting commences, thorough checks are performed on all safety components by both the steel team leader and an external expert, assuring adherence to safety standards.

The Lifting Operation

Finally, with every preparation made and each safety measure activated, the crane enters its lifting phase. The superlift counterweight, hung from the crane's rear, plays a crucial role in ensuring balance and functionality during operation. Composed of several 10-ton counterweights, this hefty setup ensures that the crane can handle significant lifting demands.