Part 2/7:
The network features Al patronic hardware, capable of delivering up to 400 KW, enabling two cars to charge simultaneously at rates of 200 KW each. Recently opened locations include Houston, Texas, and Abilene, Kansas, with plans for seven additional sites under construction. By the end of 2025, the network aims to deploy over 1,000 charging bays across more than 100 locations nationwide, with a long-term goal of 30,000 fast charging points by 2030.
Furthermore, a new recharger in Garner, North Carolina, will open alongside an Amazon “just walk out” convenience store, showcasing the growing integration of technology in the retail space.