Part 3/7:
Key areas of focus during the latest site evaluation included several newly added features such as a tent-like structure positioned next to the raw materials warehouse. This tent has been strategically installed over newly constructed loading ramps, ensuring that materials can be unloaded regardless of weather conditions. Additionally, vertical assembly operations are underway within the facility, with wall panels being added to the hydromechanical section, suggesting an increase in activity aimed at bringing various parts of the plant online.