You are viewing a single comment's thread from:

RE: LeoThread 2025-10-09 22-23

in LeoFinance4 days ago

Part 6/12:

Constructing such a massive project requires meticulous financial planning. The use of a Guaranteed Maximum Price (GMP) contract is a common approach that caps the cost of construction. However, even with this contractual safeguard, changes in material costs, such as steel, can affect the final appearance and scope of the stadium. The term "rendition" was briefly debated—highlighting some confusion over architectural terminology—but the key point is that adjustments to design and scope can be made if costs escalate.