You are viewing a single comment's thread from:

RE: LeoThread 2025-10-20 18-08

in LeoFinance4 days ago

Part 5/11:

The renovation includes installing a new, level floor—an improvement over the rocky concrete foundation that was a challenge to level. The builder used shims, glue, and thoughtful construction techniques to achieve a sturdy, leveled surface. He also built a false wall around exposed water lines and added trim work to cover imperfections, demonstrating practical problem-solving.

Lighting comes from four recessed fixtures, providing ample illumination. The walls and ceiling are finished with lightweight, paintable plywood that is easy to install—this avoids messy drywall mudding and taping, aligning with his preference for straightforward, durable solutions. The entire room is painted in semi-gloss white, making it bright, clean, and easy to maintain, crucial qualities for a pet space.