Part 7/11:

  • Power Routing and Trenching: To manage outdoor power effectively, a trench was dug to run electrical cable underground from the house to the new outdoor outlet. This involved measuring, digging, and protecting the wiring from environmental elements.

  • Dealing with Existing Structures: The builder faced challenges like drilling through large posts and avoiding existing wires, necessitating careful planning and adaptation. For example, when drilling through a 6-inch wooden post, limited access and tight space required creative routing of wires.

Practical Considerations and Challenges