You are viewing a single comment's thread from:

RE: LeoThread 2025-10-20 21-24

in LeoFinance2 days ago

Part 6/11:

To improve insulating efficiency, they plan to cut the removed foam boards into strips similar to their previous method and place them in critical areas where heat loss is most probable—particularly in the space above the wall framing, where heat tends to rise. They emphasize that the lower exterior walls are well-insulated due to the layered T1-11 siding and existing insulation, so their focus remains on the ceiling and outside walls.

Tackling the Ceiling: Soundproofing and Leak Repair