Part 9/11:
By the end of the day, significant progress was made: the walls are dried in, the door is functioning perfectly, and the structure is sealed against the elements. Additional work includes finishing the trim, installing outlets, and planning for a new roof. The builder’s focus now shifts toward interior design, with plans for a cozy, functional living space that will eventually include a television, fireplace, and comfortable seating.
The exterior is mostly complete, allowing the builder to start on interior walls and features. Despite the imperfections—color mismatches and minor aesthetic issues—the overall outlook remains optimistic. The goal is a comfortable, weather-resistant, and stylish retreat.