Part 2/9:
The persistent rain caused minor leaks, which were promptly sealed, resulting in an increasingly weather-tight structure. The builder expressed satisfaction that no further leaks had developed beyond a small drip previously identified, emphasizing ongoing efforts to keep the project dry and secure.
Foundations of the Structure: Framing and Wall Installation
With the weather slightly waning, attention turned towards framing the walls. The builder managed to complete the overall framing, including a doorway and a closet. The initial goal was to install the T1-11 sheathing across the entire structure. However, an inch shortage in height was encountered, which was planned to be resolved by adding an inch board, ensuring uniformity in height and aesthetic consistency.