You are viewing a single comment's thread from:

RE: LeoThread 2025-10-20 21-24

in LeoFinance2 days ago

Part 3/9:

While framing, the builder uncovered a rat's nest behind the siding, a reminder of the wild intrusion challenges faced during outdoor projects. Despite the obstacles, the focus remained on closing in the structure, with plans to frame in the ceiling and additional features such as an overhang or covered walkway. The cohesive look matching the existing cabin was prioritized, along with careful attention to proper sealing and weatherproofing.

Roof Construction: Rafter Installation and Pitch Alignment