Part 3/10:
Last night, some scrap materials inside the cabin were used to close off certain openings, and efforts are underway to prevent water intrusion into the new roof edge with a small lip. The focus then shifts to leveling and aligning the newly poured concrete structure to ensure the walls will sit perfectly flush. Utilizing a level, the builder tests the accuracy—finding slight discrepancies that will be corrected with shims, demonstrating the importance of precision in construction.