You are viewing a single comment's thread from:

RE: LeoThread 2025-10-20 21-24

in LeoFinance2 days ago

Part 6/10:

The assembly process involves laying the wall panels on the ground, lining them up with the existing structure, and then raising them into position. The builder emphasizes the importance of leveling and squaring each component to ensure proper door installation and structural integrity. The specific measurements are checked multiple times for accuracy, and the process reveals a meticulous approach to avoid costly mistakes.

Progress and Future Plans