The project begins with anticipation and a clear plan. The builder has twenty-five bags of concrete ready, knowing there may be more than necessary but opting to have extra supplies on hand. Digging out the area involves some rough excavation, with progress hampered by uneven depths—one spot was dug a little too deep, complicating the leveling. To ensure a smooth finish, a makeshift form is devised: a 2x4 is placed across the edge, left embedded in the wall for reference, aiding in maintaining proper elevation aligned with the sidewalk level.

Gathering Tools and Supplies