Part 5/11:
Pouring is a labor-intensive but rewarding process. The builder employs vibrators—both a hand tool and the weight of a leveled 2x4—to eliminate air pockets and ensure uniformity. Multiple batches are mixed, with the total count reaching approximately eleven bags for the initial section, then followed by a second round to finish the larger area. There's a constant focus on precise leveling, with the builder measuring against existing structures like the T111 siding and foundation to achieve an even, professional finish.