Part 6/11:
The walls are prepped with holes drilled for window installation, and flashing tape is applied meticulously to prevent leaks. Windows are then inserted with care, sealed with additional flashing tape, and trimmed finished. The process is detailed, with emphasis on aligning each window perfectly and ensuring a secure fit—"we can fit one solid piece of trim in between."