You are viewing a single comment's thread from:

RE: LeoThread 2025-10-20 21-24

in LeoFinance2 days ago

Part 4/10:

Having completed the ceiling, the builder meticulously seals gaps with caulk, emphasizing attention to detail. Repainting minor parts and touch-up work follows, ensuring a clean, finished look. A significant part involves installing pegboard on the walls for maximum storage efficiency—a decision driven by practicality and space optimization. The old bar top boards, repurposed as shelves, serve both as a testament to resourcefulness and structural strength.

Electrical and Lighting