Part 3/11:

Detailed explanations include the necessity of site preparation—leveling the ground, removing old stumps, and clearing space for the new building. The building will sit on sturdy blocks for stability, with an emphasis on constructing a robust and durable foundation using ¾-inch plywood floors and 12-inch on-center studs. The plan is to match the aesthetic of the existing cabin, ensuring the new structure appears as a cohesive extension rather than a separate entity.

Infrastructure Upgrades: Driveway and Access