Part 3/9:
The project includes patching a section of drywall where a previous 2x4 was attached, demonstrating resourcefulness. The builder notes the windy weather, which could hinder outdoor work but remains committed to moving forward, emphasizing perseverance in their workflow.
Constructing the Frame
Using a saw and clamps, the builder cuts eight legs and frames the cabinet's base, ensuring support for drawers and appliances. They measure precisely for drawer slides and plan to assemble the frame on the sidewalk, making it easier to handle large pieces before moving them into the house. Emphasis is placed on building a sturdy, level structure capable of supporting the weight of countertops and stored items.