You are viewing a single comment's thread from:

RE: LeoThread 2025-10-21 23-03

in LeoFinance3 days ago

Part 2/10:

Throughout the process, the builder emphasizes the importance of proper stud marking. Using a T-square, he locates the center of each stud, including double studs, which often have more space between them. He recommends measuring an inch down from the stud center, then following that line down every 12 inches, to accurately position screws without the need for drawing continuous lines, thereby saving time and effort. This technique ensures that drywall is securely attached while minimizing unnecessary markings.

Handling Out-of-Square Walls and Leveling