You are viewing a single comment's thread from:

RE: LeoThread 2025-10-21 23-03

in LeoFinance2 days ago

Part 4/11:

The land slopes gently and varies across the property, influencing how the foundation will be built. The plan involves elevating the structure slightly off the ground on blocks to prevent moisture damage, especially considering potential floods or water flow from rainfall. The host mentions removing two leaning trees to clear space while noting that the slope affects the final placement height and orientation.

A detailed measurement process is demonstrated to ensure the building fits within the designated area—roughly aligning with the back of the house, equivalent to about 16 feet in length. The host emphasizes the importance of leaving enough clearance for vehicles and emergency access, which influences the final position.

Electrical and Utility Planning