Part 5/10:
He proceeds to insulate the space using foam board and patches gaps with Great Stuff foam, sealing every crevice to prevent drafts and pests. The space is tiny, limiting camera and tool placement; thus, most work is done manually and in cramped conditions, often requiring patience and ingenuity.
Framing and Enclosing the Cubby Hole
Next steps include installing joists for a new roof—an extension of the existing deck—made from scrap lumber. The builder deliberately leaves part of the space unfinished, planning to use plywood for flooring that will not be load-bearing but adequate for outdoor storage. He emphasizes that the area isn't designed for foot traffic, just for storing chairs and outdoor gear.