You are viewing a single comment's thread from:

RE: LeoThread 2025-10-22 02-12

in LeoFinanceyesterday

Part 2/9:

The process kicks off with a clear plan: run electrical wires and plumbing lines simultaneously for efficiency. The builder prepares by gathering necessary materials — outlets, switches, wire, drill bits — and visualizes the layout. A wall-mounted light is considered for simplicity, as the ceiling has a complex structure. An outlet for the air conditioner is also planned, along with wiring for future electrical needs like the washer and dryer.

A key idea is placing the washer and dryer on a raised platform. Benefits include easier access and better clearance, especially considering uneven flooring and potential future adjustments. Although the platform isn’t built immediately, the focus remains on routing electrical and plumbing installations for the day.


Electrical Work Begins