Part 5/9:
The project involves sourcing cedar lumber from a sawmill, with plans to build entirely without concrete—likely a raised foundation or framing method to simplify construction and avoid concrete pouring. Drainage considerations are also part of the plan; a French drain is being contemplated to prevent water accumulation around the new structures.
Construction is planned for the upcoming weeks, aiming to finish before the heat intensifies, with an estimated construction window of about a month and a half. The plan includes two roofs: one for the greenhouse and one for the screened porch, with a deck to be added atop the new construction.