Part 7/8:
With the stairs structurally sound and visually improved, the builder moves toward finishing touches, such as installing board and batten paneling and patching large holes. He reflects on the ongoing nature of the project, acknowledging that some elements—like the stair materials—are interim solutions until a permanent choice is made.
He plans to wait before installing cedar or other finishes until the entire space is fully prepared, showing his strategic approach to renovation. The builder's iterative process—building, adjusting, and refining—exemplifies a thoughtful method to home renovation.