Part 3/10:
- Precision Placement: The modules were carefully leveled and aligned using cables, measurements, and close supervision to ensure a perfect fit.
The process emphasized customization, adaptability, and rigorous pre-planning, reflecting Atlas’s commitment to quality and client satisfaction.
Groundwork and Structural Integrity
Proper excavation and foundation preparation are crucial for the longevity of the bunker. The team performed careful backfilling with high-quality rock and soil to aid water runoff and prevent moisture intrusion.
- Dirt Work: Skilled operators managed the excavator to backfill around the bunker, ensuring stability.