Part 7/10:
Weatherproofing: The team coated welds and surfaces with primer and paint, often during cooler night hours, to prevent water and corrosion.
Foundation and Anchoring: The bunker was securely anchored to a reinforced pad, with rocks and gravel used to stabilize the structure against shifting or subsidence.
Final Touches and Interior Finishing
After assembly, the focus shifted to refining the living environment:
Interior Walls and Floors: Smooth, sealed welds covered structural joints. Floors are being glued with durable, easy-to-clean materials.
Plumbing and Water Systems: Multiple water tanks supply over 600 gallons for long-term storage, with reverse osmosis filtering integrated for clean drinking water.