Part 3/6:
Enter Cover, a pioneering company at the forefront of this movement. Significantly, they have demonstrated that constructing a home in just 33 days is feasible—an incredible feat compared to conventional methods that can take months or even years. This company has developed a process that involves creating houses from factory-built panels, assembled much like Lego blocks. Such modular, prefabricated components allow for quick on-site assembly, drastically reducing construction time.