You are viewing a single comment's thread from:

RE: Road damage occurred due to heavy rain

in Architecture+Design3 years ago

Road erosion and landslides have become major issues when dealing with vulnerable street projects exposed to strong weather elements like wind and rainwater. Retaining walls and water flow channels are sound solutions to these problems and would help control further damage. How long does it usually take for a 100-meter road project to be repaired with the mentioned solutions?

Sort:  

if using precast concrete only takes 2 weeks. if you had to build it manually in the field it would take more than a month. I prefer they use precast concrete only takes 2 weeks.

it is for duct work and retaining walls

Indeed, precast concrete street elements are more practical, efficient, and save a lot of time on the site as everything is already pre-assembled. Please update us on this project if your team decides to proceed with the road repair work.

We have submitted the problem of repairing this road to the government. If later we win the tender and continue working on this road. I will make a report on road repairs.