The installation of a composite bridge is important and requires the steps to be done:
The installation of a composite bridge consists of two stages, ie
· Stage installation of steel girder
· Floor casting which is part of the structure of the composite typeInstallation of girder can be carried out by means of scaffolding or by way of launch.
Installation of the girder shall refer to the design carried out, because when used by launching, there can be a presumption in the calculation that the girder holds all the dead load of concrete above the girder before the concrete hardened.
While in the installation by means of scaffolding, the scaffolds must be calculated to withstand the load of steel and concrete gels as dead loads before hardening.Create the camber as required, because in the absence of camber will reduce the capacity of the composite girder security
The new composite girder serves as a composite when the concrete above the girder solidifies and cooperates with the girder into a single entity in a structure
Hello! I just upvoted you! I help new Steemit members! Upvote this comment and follow me! i will upvote your future posts! To any other visitor, upvote this post also to receive free UpVotes from me! Happy SteemIt!
vote me
Nice pict,
Follow me @faizil95
follow me back @faizil95
nice post,