With another kid on the way, and the clock ticking down until the arrival. I have been adding on a new bedroom to the house, and moving the position of the bathroom to make it more convenient. This is usually a pretty straight forward process, develop a plan, and move on. But, this time it has been more difficult, mostly because of the copious amount of rain we have received during the foundation process. We got about 4 inches of rain, with more on the way, and I have just dug a big pond. About half of the footings have caved in, and there was about 7 inches of water in them that I had to pump out before I could re-dig out the dirt. Sometimes the only thing to do is shake your head and get back to work.

